Precast concrete

A new look and a future secured with Belgian fair-faced concrete façade structures

Tekst Philip DoutreligneBeeld Decomo

Het slanke skelet met kolommen en liggers.
Het slanke skelet met kolommen en liggers.

Renovation of Princess Irene 59, Amsterdam

Decomo in Mouscron specialises in bespoke architectural concrete of outstanding aesthetic and technical quality. Founded as a contracting company in 1977, it has grown into an expert in high-end precast concrete elements. Recently, it was involved in the renovation and redevelopment of an iconic building, PI59, on Amsterdam’s Zuidas. The works were carried out by Dutch contractor Wessels Zeist, while the terrazzo fair-faced precast elements were made by Decomo.

Characterful façades in concrete and glass.

An icon brought back to life

Nuveen Real Estate and G&S Vastgoed, together with V8 Architects, undertook the renovation and repurposing of PI59. The iconic office complex dates from the 1970s and is now being refurbished. Since 2003, the building had housed the Amsterdam International Community School (AICS). After the school moved to a new location, the way was clear to restore PI59 to its historic function as an office building and add an extra storey. Completion is scheduled for the end of this year. The result will be an innovative and prestigious boutique office in the heart of Amsterdam’s Zuidas. The six floors are being converted into 17,800 m2 of future-ready office space, with a strong focus on today’s sustainability requirements. 

The building was originally designed in the Brutalist style and is now being fitted with new concrete façades featuring generous areas of glazing. The large windows with curved glass make the building stand out. Decomo’s terrazzo façade elements also give it a strikingly lively appearance. The solid character of the old façades has been reinterpreted as a kind of elegant neo-Brutalism, paying homage to the original style.

The concealed connection between horizontal and vertical elements.

Choice of materials and finishes

Werner Hulstaert, Technical Sales Manager at Decomo Nederland: “We were responsible for producing all the columns, intermediate columns, beams and plinth. The concrete was given a terrazzo look by incorporating coarse Niagara Blue stones as aggregate in the concrete mix. This natural stone was embedded throughout the architectural concrete and remains clearly visible on the surface.” The long beams and solid columns were stacked around the large curtain walls to form an exoskeleton and were given a robust appearance by polishing. “The blue-grey colour of the ‘sprinkle stones’ contrasts beautifully with the other gravel and sand in the mix, which consists mainly of Norwegian marble.”

Two finishes were used: the plinth elements were cast on rubber relief mats with flutes and then shot-blasted. On the floors above, all exposed faces were polished to a high-gloss finish. A combination of the two finishes was used at the transition between the plinth and the upper floors. The intermediate columns were polished on three sides, and the corner columns on all sides.

Practical execution

The demolished original façades featured deep fluted panels in horizontal bands, made from exposed aggregate concrete. After the floor edges had been modified and the large aluminium window frames installed by Rollecate, Wessels stacked the new columns and beams down to the foundations. Once the structure had been made airtight and watertight, steel brackets were installed. At the junctions, these enabled a very precise concealed connection to the existing structural frame. Decomo was responsible for the full 3D engineering, which was incorporated into Wessels’ BIM model. Wessels handled the engineering of the anchors. Despite the thorough preparation, connecting the beams and columns invisibly remained a major challenge for Decomo.

Some impressive figures

Decomo was responsible for producing and delivering no fewer than 280 columns, 236 beams and 400 m2 of flat façade cladding. A total of 600 m3 of concrete was used for a finished surface area of 5,000 m2. Streamlined production, extensive polishing and storage facilities at Decomo, and 75 deliveries made on time, carrying up to 80 elements per week, ensured smooth progress and excellent collaboration. 

Vraag over dit verhaal? Stel je vraag

Wie eraan werkte

PI59 in Amsterdam, renovatie

  1. architectV8 Architects
  2. aluminium kozijnenRollecate

Blijf dit volgen

Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.

Wat je volgt
  • ProjectPI59
  • OnderwerpPrecast concrete
  • BedrijfV8 Architects
  • BedrijfRollecate
Deel dit artikel

Advertentie

Volgen op Beton & Staalbouw

Volg

Bij een project of bedrijf krijg je een e-mail zodra er een nieuw verhaal over verschijnt, bij een thema of onderwerp één keer per week een overzicht. Geen account en geen wachtwoord: in elke mail staat een link naar wat je volgt.