Platform on concrete and steel in construction

Artikelen

Customer-specific customization of steel formwork and circulation systems 1

Customer-specific customization of steel formwork and circulation systems

No circular economy without concrete maintenance 2

No circular economy without concrete maintenance

Belgian steelmaker takes lead in sustainability 3

Belgian steelmaker takes lead in sustainability efforts

Selective Withdrawal diverts salt water back to the sea 4

Selective Withdrawal directs salt water back to the sea

The 24th BIBM Congress 2023 in Amsterdam 5

The 24th BIBM Congress 2023 in Amsterdam

The balconies, sandwich parapets and frame elements are executed on the visible side in aesthetic concrete.

Cooltoren Rotterdam: Building package with precast (exposed) concrete elements

Steel Fabricator Gets Off to a Flying Start 6

Steel manufacturer gets off to a flying start

30 Years of Partnership in Innovation 7

30 Years of Partnership in Innovation

Masonry reinforcement on a roll. Flexible and easy to use 8

Masonry reinforcement on a roll. Flexible and easy to use

‘Concrete maintenance is something you should manage, not just endure’ 9

‘Concrete maintenance is something you should manage, not just put up with’

Becoming more sustainable without losing momentum  10

Becoming more sustainable without losing momentum 

Liemar voor Oekraïne: steun ons kachelproject 11

Liemar for Ukraine: support our stove project

Improving Quality in Precast Concrete Production 12

Improving quality in precast concrete production

Why ERP, MES, and APS Together Make a Difference in Industrial Construction 13

Why ERP, MES and APS together make the difference in industrial construction

#4 – Joost Kunst van Kobout on bolts, nuts, inventory management, and supply chains 14

#4 - Joost Kunst of Kobout on bolts, nuts, inventory management and supply chains

Het belang van testen in staalframebouw 15

The importance of testing in steel frame construction

Staalframebouw:bouwen als logistiek proces 16

Steel frame construction:building as a logistics process

Bouwen waar het eerst niet kon 17

Building where it could not before

Gewoon een ijzersterk team 18

Just a rock-solid team

Liemar 40 jaar: het eenendertigste tot en met het veertigste jaar 19

Liemar 40 years: the thirty-first to the fortieth year

Van scepsis naar bewezen techniek 20

From skepticism to proven technology

Grip op staalbouwprojecten met één geïntegreerd ERP-systeem 21

Grip on steel construction projects with one integrated ERP system

Gecertificeerde paalfundering zonder herrie 22

Certified pile foundation without noise

Ecocem ondertekent een MoU met Tata Steel IJmuiden om next-generation low-carbon cementmaterialen te ontwikkelen 23

Ecocem signs MoU with Tata Steel IJmuiden to develop next-generation low-carbon cement materials

Cementvrije bouwsteen garantie voor CO2-reductie en circulariteit 24

Cement-free building block guarantees CO2 reduction and circularity

Certainty with high stakes 25

Certainty with high stakes

Staalbouwer kan omgaan met verrassingen bij renovatie Binnenhof 26

Steelworker can deal with surprises in Binnenhof renovation

Jos Kronemeijer: Bent u wel ‘future-proof’? 27

Jos Kronemeijer: Are you ‘future-proof’?

Wanneer werkt je integratie met bocad of Tekla écht goed? En waarom KISS en DSTV daarin het verschil maken. 28

When does your integration with bocad or Tekla work really well? And why KISS and DSTV make the difference.

Digitaal meten is weten. Digitaal delen is winnen. 29

Digital measuring is knowing. Digital sharing is winning.

Van systeembouw naar prefab hoogbouw 30

From system construction to prefabricated high-rise buildings

Nieuwsbrief

Meld u aan om nieuws & updates te ontvangen.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Contact

Mark de Lau

Projectmanager

Curious about the possibilities? I would be happy to tell you all about our collaboration packages.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

Send us a message

Wij gebruiken cookies. Daarmee analyseren we het gebruik van de website en verbeteren we het gebruiksgemak.

Details

Kunnen we je helpen met zoeken?

Bekijk alle resultaten