Smart building blocks for a circular future: reuse at the heart of new industrial construction

Willy Naessens Group has launched The Circle®, a revolutionary circular construction concept. Using one hundred components, industrial construction projects can be delivered quickly, flexibly, sustainably and modularly. This smart concept, which enables construction using ‘Lego bricks’ made from materials including precast concrete, is designed to facilitate the reuse and recycling of logistics property at the end of its service life. Willy Naessens is also serving the Dutch market with The Circle®. The concept is particularly attractive to developers, architects, contractors, investors and consultants looking to build quickly and effectively, meet sustainability requirements and help shape a circular future.

Willy Naessens Group has been a trusted partner for more than sixty years on sustainable, complex, integrated industrial construction projects using precast concrete. Willy Naessens Nederland is part of Willy Naessens Group and has been a leading player in the construction sector for many years. In 2024, as part of its drive to broaden its offering and improve sustainability, the group developed a groundbreaking concept designed to extend building service life and shape the future of industrial construction: The Circle®. Willy Naessens Group is a pioneer in this field, having found the fastest and most efficient way to deliver circular industrial construction projects with an extended service life, and to adapt robust industrial buildings for new uses or recycle them in part. With this flexible logistics concept, the company is responding to growing demand for high-end commercial property. “This puts Willy Naessens at the forefront of developing solutions in a rapidly changing market that needs to become more sustainable,” says Erik Koremans, Chief Sustainability and Commercial Officer (CSCO) of Willy Naessens Nederland.
Making construction modular
“We’re turning construction into Lego,” says Koremans of the ‘construction kit’ comprising one hundred precast building blocks that can be assembled dry and dismantled. Seventy per cent of the precast concrete elements can be reused in new construction projects without modification, while 25 per cent can be recycled to a high standard. The blocks interlock in a specific way, eliminating the need for auxiliary steel structures or cast-in-situ concrete and significantly reducing CO2 emissions.
The concept is closely aligned with Willy Naessens’ mission to build a better future for generations to come. This starts with circular concrete construction, with a positive environmental impact and less waste, CO2 and nitrogen emissions as its key priorities. Industrial buildings constructed using The Circle® have a lower environmental footprint than conventional concrete construction systems, helping to achieve sustainability targets such as the Sustainable Development Goals (SDGs). “We’re continually taking steps towards a sustainable future,” says Koremans. “Because every step is needed to get to the other side.”

A final design in two hours
Willy Naessens has developed an innovative 3D tool that can produce a final design within two hours, including a real-time indication of the total investment, at a cost that can compete with traditional construction. All specifications, dimensions and costs are transparent for each component. This makes it possible to deliver industrial buildings very quickly.
Using standard grid dimensions of 24×12 metres enables efficient production of the precast concrete elements, which are often available from stock. This cuts preparation time by several months compared with traditional construction methods. What’s more, when a logistics building no longer meets its original purpose after around 25 years, the concrete modules can easily be dismantled and reused elsewhere. This avoids a substantial part of the construction process and saves time, materials and (environmental) costs.

For now, the leading construction company is focusing The Circle® primarily on logistics property, given its large number of established clients in that market. The first building based on The Circle® concept has already been completed in Belgium: a 40,000 m² logistics complex for Intervest, made up of one hundred circular building blocks. In the Netherlands, too, a growing number of parties are joining The Circle®, and enquiries about using this circular solution for logistics buildings are increasing.
Een zakelijke vraag aan Willy Naessens Group? Neem contact op
Bedrijven in dit verhaal
Blijf dit volgen
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ThemaMinder CO2 in beton en staal
- OnderwerpConcrete
- BedrijfWilly Naessens Group



















