Hercuton is building a new head office and distribution centre for MTS Euro Products on the De Dijk industrial estate in Maassluis.

Thanks to a well-balanced floor design and the application of a special dust binder to the top layer of the floor structure, the hygiene products supplier can look forward to a dust-free warehouse floor. We spoke to Jeroen Boers of Twintec Nederland, which is responsible for installing the monolithic floors with a ten-year performance guarantee.

Twintec is supplying around 26,000 m2 of monolithic flooring for the new distribution centre. More than 19,000 m2 of warehouse floor will be built as a hybrid floor with basic reinforcement and steel fibres, to flatness class DIN 18202 line 4. “The initial design for the floors on piles was drawn up by ABT, a renowned engineering firm with extensive experience in floor design,” says Boers. “We adopted the design as a starting point, checked it and developed it further so that we could ultimately provide our Design, Build and Guarantee performance guarantee for the finished floor. For the end user, this means they will not have to worry about the floor for ten years.”

Twintec is supplying around 26,000 m2 of monolithic flooring for the new distribution centre.

An engineering challenge

The floor design is characterised by a relatively wide pile grid, says Boers. “To achieve a well-balanced design, we use pile-head thickening. The floor is thickened above the piles to accommodate the point loads. This avoids having to make the entire floor thicker. It is truly an engineering challenge to arrive at the optimum solution. A total of 5,000 m3 of concrete will be placed in fifteen phases. The warehouse floor will be completed in nine pours, the loading bay structure (3,000 m2) in two pours and the structural topping layers (4,000 m2) in four pours. The warehouse floor is treated with a dust binder the day after pouring. This further hardens the top layer and prevents premature wear and the resulting dust formation.”  

Een zakelijke vraag aan Hercuton? Neem contact op

Bedrijven in dit verhaal

Blijf dit volgen

Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.

Wat je volgt
  • OnderwerpProjects
  • BedrijfHercuton
Deel dit artikel

Advertentie

Volgen op Beton & Staalbouw

Volg

Bij een project of bedrijf krijg je een e-mail zodra er een nieuw verhaal over verschijnt, bij een thema of onderwerp één keer per week een overzicht. Geen account en geen wachtwoord: in elke mail staat een link naar wat je volgt.