A sheet piling contract at Van Gendt Hallen leads to extensive work
Heicombinatie SPS’s involvement in the transformation of Van Gendt Hallen has taken a, to put it mildly, unusual course. It started with a small contract: “My business partner Johan Schilder was asked whether we could install sheet piling for the construction of a marina at the VOC quay,” says managing director Gert-Jan Potveer. “That was all.” More than two years on, the company from Grootschermer is still working there, with six to ten people on site at all times.
“After a good discussion between the two parties, it became clear that we could carry out a lot more work there, and we were not even the first to start on the sheet piling,” Potveer continues. “In the 13,000 m2 building, which we completely re-founded using more than 1,300 screw-injection piles, we have carried out an incredible amount of work. In addition to the sheet piling and pile-driving work, the soil was remediated to make way for the new concrete structures we built, including the cycle parking basement, which creates additional volume and usable floor space, the landing stage for the tour boat, the plant room, the car park with its concrete ramp, and all the concrete floors in the five halls. These include both the ground-floor slab and the upper-floor slabs for the homes and offices. Expansion joint profiles have been installed to control movement in the vast floor areas. The heavily reinforced joint ensures excellent load transfer, which is essential given that several storeys will rest on the ground-floor slab.”

Pandora’s box
SPS is known for its flexible approach. “Van Gendt Hallen owner Eduard Zanen acts as team leader of a complete construction team without a main contractor,” says Potveer. “The old building now embodies the ideas that have sprung from his imagination. Everything that has been built was conceived by him. But, as is usually the case with old buildings, it has brought many surprises to light, like opening Pandora’s box. Given the wide range of work we do and the experience we have gained as a company, we are used to operating without a contractor. We always find a solution. That is why it did not stop at a single sheet pile.”

Staircase
The new Van Gendt Hallen will also house a museum, and, as befits true artists, the museum itself is already a work of art. “We installed a gigantic concrete staircase for the museum. We are now at the stage where all the designs are becoming visible, including the museum staircase, which will serve as a tiered seating area for art lovers. The homes and offices are also beginning to take shape. It is fantastic to be able to contribute to the project.”

Respect
SPS managing director expects to be working on Oostelijke Eiland for some time yet. “The completion date has been set, but we still have our hands full with the final structural works before then. I can already say that this is a highly innovative transformation of a magnificent historic Amsterdam building. Deep respect for the whole team bringing it all together. And the sheet piling that started it all? We pulled it out in March. The quay has been restored to its former glory. Let the first visitors come. They will be amazed.”
Een zakelijke vraag aan Heicombinatie SPS? Neem contact op
Wie aan de Van Gendt Hallen werkte
- herontwikkelde het gebouwBraaksma & Roos ArchitectenGenoemd in Innovation and experience as drivers of design
- staalplaatbetonvloer
Tullingh & PartnersGenoemd in Construction team opts for composite steel deck floors - eigenaarEduard ZanenIn dit verhaal
- ArchitectenbureauBraaksma & RoosGenoemd in The Van Gendt Hallen in Amsterdam-Centrum Oost: from nostalgic factory hall to stylish energy-positive icon
Blijf dit volgen
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectVan Gendt Hallen
- OnderwerpProjects
- BedrijfHeicombinatie SPS
- BedrijfEduard Zanen