Formwork with one-sided tie technology saves labour time

Construction is under way in the heart of The Hague on the Education and Culture Complex (OCC). At its centre are four halls, each with its own shape and atmosphere. The high acoustic requirements mean that a huge volume of concrete is being used. It is a technically and structurally challenging project for the Cadanz construction consortium (Boele & van Eesteren | Visser & Smit Bouw), which is saving a considerable amount of labour time by using PERI formwork with one-sided tie technology.
Self-climbing core formwork with PERI CB 240 climbing brackets and PERI MAXIMO panel formwork.

The OCC is being built on Spuiplein and will become the new home of the Stichting Dans- en Muziekcentrum Den Haag, Nederlands Danstheater, Residentie Orkest and Koninklijk Conservatorium. According to Birgit Maathuis, site manager for the Cadanz construction consortium, it is a unique ‘(concrete) project’ by Dutch standards. “Both in terms of scale and structural challenges. Everything here revolves around mass. The complex consists more or less of seven separate units: four halls, the theatre hall (1,500 people), concert hall (2,500 people), ensemble hall (600 people) and rehearsal hall (200 people), and three stability cores, each with its own foundations and structurally separate from the others.”

PERI MAXIMO
The concrete structures of the halls and stability cores are all cast in situ. Cadanz is relying on PERI’s MAXIMO panel formwork. “It is a modular formwork system that is easy to assemble and dismantle, and, not least, delivers an attractive finish,” says Maathuis. “We use several types of PERI formwork, but the bulk is MAXIMO.” John Appelhof, project manager at PERI BeNeLux, confirms this: “The OCC is our biggest project in the Netherlands at the moment. There is around 2,800 m2 of MAXIMO formwork on site. A major advantage of this type of formwork is the one-sided fixing, without spacers or cones. That saves a tremendous amount of time. And to build the high walls of the halls, up to 38 metres tall, we are supplying our CB climbing system, a crane-climbed system that enables large heights to be achieved quickly and efficiently.” Maathuis is also enthusiastic about the formwork system. “Our people know the PERI system very well and enjoy working with it. This means we can build large volumes in a short time. Hundreds of cubic metres of concrete are poured every week.”
Pre-assembled PERI VARIO GT 24 column formwork, 9.6 metres high.

One-sided fixing and dismantling
The one-sided fixing and dismantling of the MAXIMO formwork is particularly useful at the OCC, where halls are being built above one another. Maathuis: “This is where the complexity of the work lies. Right next to both lower halls, we are building the walls for the halls above, which rest on their own foundations and pass right through the basement floor. We are now in the thick of the concrete work and expect to complete it in the second half of 2019.” The OCC is scheduled for completion and opening in 2021.
Text | Roel van Gils Image | PERI
Featured image: Concrete finish achieved with PERI MAXIMO panel formwork, with a regular panel-joint and tie-hole pattern.
Een zakelijke vraag aan PERI BeNeLux B.V.? Neem contact op
Wie eraan werkte
Onderwijs- en Cultuurcomplex (OCC) in Den Haag
- bekisting
PERI - bouwcombinatieBoele & van Eesteren
- bouwcombinatieVisser & Smit Bouw
Blijf dit volgen
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectOnderwijs- en Cultuurcomplex (OCC)
- OnderwerpProjects
- BedrijfPERI BeNeLux B.V.
- BedrijfBoele & van Eesteren
- BedrijfVisser & Smit Bouw