Impressive residential building on the Maas
Tekst Ramona KezerBeeld STATON Bouw

Living by the water
STATON Bouw is building 124 homes at the old harbour entrance, west of Flying Dutchmanstraat in Rotterdam. All the homes overlook the Nieuwe Maas, and the Waterside II project features a distinctive design by Eentien Architecten.

Construction started in February 2022, and the homes are expected to be completed in late 2023/early 2024. The project comprises rental homes in the mid-market and higher price brackets. The building steps up from three storeys to ten on the river side. The lower floors will contain the apartments, with a penthouse on the top floor. The project comprises 113 sustainable apartments in 24 variants and eleven houses. Home sizes range from 65 to as much as 190 m2, and all have an outdoor space, such as a (loggia) balcony, conservatory and/or terrace.

Distinctive design in a beautiful location
“The project has a distinctive appearance,” says STATON Bouw site manager Alex Krijnen. “That is down to the rounded entrance combined with the stepped design, but of course also to its beautiful location on the Maas.” The triangular building block stands above an underground car park, with a communal roof garden on top. It is a great project for STATON Bouw, and its biggest to date, says works planner Stanley Muilwijk. “The front façade will be finished with attractive composite cladding. The courtyard side will have timber cladding. The courtyard garden will be designed for communal use.”
Sustainability and living comfort were also given considerable attention. “There will be a sustainable system with heat pumps and solar panels, and the roof will be a green roof. The apartments will also have an open balcony and a sound-insulated enclosure, allowing residents to sit outside without being disturbed by noise from the Van Brienenoordbrug.”

Good agreements with suppliers
Construction is progressing well so far. Krijnen says: “We have good agreements with our suppliers, so if we order on time, the materials arrive when they should.” Cooperation with the various subcontractors is also running smoothly. Mulder Betonbouw is responsible for the concrete frame, Van den Pol Elektrotechniek for the electrical installations and Linthorst for the thermal energy storage system. “We have agreed on who can work where and when on each section of the floor, so we do not get in each other’s way. It takes some time to plan, but it means there are no surprises.”
A pleasant, green public space
The Waterside development will eventually comprise three buildings. Waterside I was built in the 1990s, and plans are already in place for Waterside III, an apartment building around seventy metres tall. The municipality plans to landscape the quayside at Waterside I and the outdoor areas at Waterside II and III, creating green spaces where residents can enjoy the riverfront. The aim is to provide a pleasant public space where Rotterdam residents can walk and relax.
Vraag over dit verhaal? Stel je vraag
Wie eraan werkte
Waterside II in Rotterdam
- OpdrachtgeverWaterside II bv
- hoofdaannemerSTATON Bouw
- architectEentien Architecten
- BetoncascoMulder Betonbouw
- E-installatieVan den Pol Elektrotechniek
- S-installatieIBW
- WKO-installatieLinthorst
- Verwarming en koelingVATA Nederland
- Ventilatie-installatieInstallatietechniek Vink
Blijf dit volgen
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectWaterside II
- OnderwerpProjects
- BedrijfWaterside II bv
- BedrijfSTATON Bouw
- BedrijfEentien Architecten
- BedrijfMulder Betonbouw
- BedrijfVan den Pol Elektrotechniek