De Vergaderfabriek, Teuge | World first: 3D printer builds the ideal meeting venue

On Wednesday 30 January 2019, pupils from De Zaaier primary school in Teuge marked the start of construction by placing a time capsule in the cavity of the first 3D-printed concrete wall of De Vergaderfabriek. The capsule contains letters addressed to the future and will come into play when the building is recycled in the future.
De Vergaderfabriek is Europe’s first 3D-printed building commissioned for commercial use. It was designed by Pim van Wylick of The Form Foundation. Under the motto ‘Wake up in a new world’, Marjo and Arvid Prigge of De Slaapfabriek have developed a completely new vision for training and meetings. They dreamed of an additional meeting venue but did not want to compromise on the purpose or quality of the space in its design.
Choosing 3D concrete printing makes it possible to build freely in rounded and curved forms that directly meet users’ requirements. At the same time, Arvid Prigge of Centre4Moods has developed a unique meeting concept for De Vergaderfabriek using wall-sized film images, scents and sound. Together, Arvid and Marjo are shaping a completely new way of training and meeting that directly reflects how our brains work.
De Vergaderfabriek is the first venue in Europe where people can experience and try out this concept. Both the form and the content of the building create a new experience of space and the senses.
The first wall. (Image: De Vergaderfabriek)

Building printed in under ten days
De Vergaderfabriek is Europe’s first commercial 3D-printed concrete building. It will serve as a leading example of clean, revolutionary construction technology for the future, helping to drive major changes in the construction industry and our society. Berry Hendriks of CyBe: “This new technology will have a major impact and help build confidence in 3D printing buildings, both in the Netherlands and abroad.” De Vergaderfabriek is being printed on site in less than ten days.
Reducing material waste
Witteveen+Bos has joined the consortium as structural engineer and 3D concrete printing specialist. Hans Laagland and Marijn Bruurs (Structural Engineer) on the benefits of this technology: “It is great to see what this can lead to, because printing technology has a much wider scope and offers opportunities to achieve major sustainability gains. Think of reusing materials, the enormous reduction in material waste, or using stronger and weaker concrete in different parts of a structure.”
From dream to reality
De Vergaderfabriek was initiated by Marjo and Arvid Prigge. Ten years ago, they founded De Slaapfabriek in Teuge. The venue was increasingly being used for meetings and training, which gave them the idea of building De Vergaderfabriek for the business market. Keen to create something truly special, they submitted the idea to The Dutch Construction Hackathon in Oss in May 2016. The hackathon laid the foundations for the dream they are now bringing to life. Together with consultancy Revelating, they assembled a team of companies representing the best of the Dutch 3D printing and construction industry: Cybe, The Form Foundation, Witteveen+Bos, Elma Media, Lexence Advocaten and Revelating. Project manager Hugo Jager: “The process is a series of trials, analysis and adjustments. Our goal is to prove that 3D printing is technically and economically viable.”
A new way of meeting
The building will be an immersive environment for training and meetings, where images, scents and sound will play a crucial role. Arvid Prigge and Marjo Prigge: “We realised it was time for a new meeting concept that would not only give individual guests, groups and teams an unforgettable experience, but also create an environment where people can work more comfortably and effectively. De Vergaderfabriek is the first venue in Europe where people can experience and try out this new working environment.”
Words | De Vergaderfabriek Image | The Formfoundation
Vraag over dit verhaal? Stel je vraag
Wie eraan werkte
De Vergaderfabriek in Voorst
- ontwerpThe Form Foundation
- constructeurWitteveen+Bos
Blijf dit volgen
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectDe Vergaderfabriek
- ThemaBouwen als productieproces
- OnderwerpProjects
- BedrijfThe Form Foundation
- BedrijfWitteveen+Bos


















