New-build data centre at Polanenpark, Amsterdam | Huge savings thanks to concrete formwork system and ‘thicker’ floor

Cosimco is building a new campus for American data centre operator CyrusOne Inc. at the Polanenpark business park in Halfweg (Amsterdam Metropolitan Area). The Belgian contractor is working closely with a number of local partners, including Van Berlo. The expert in industrial floors and foundations managed to achieve huge savings, both in time and money, by taking another look at the original foundation and floor design.

The new data centre is 22 metres high and 63 metres deep, and will have a total area of 27,000 m² across three storeys. The campus has an estimated capacity of 72 megawatts. The foundation comprises around 3,500 precast piles, on which Van Berlo casts large pile caps for the steel construction and the generator park outside the building. “A total of 260 pile caps have been installed, 24 of which are no less than 14 metres long,” says Jasper Manders, Project Coordinator, System Foundations at Van Berlo.

Van Berlo produces the pile caps using a concrete formwork system, rather than the commonly used steel system formwork.
Fast-paced construction
Van Berlo produces the pile caps using a concrete formwork system, rather than the commonly used steel system formwork. Manders says: “The formwork system was developed by Van Berlo Systeemfunderingen. We decided to cast the concrete panels at our precast facility. On site, we then create a stable working platform on the precast piles, on which the reinforcement cages are placed. Next, we position the four elements of the concrete formwork system, connect them using spindles, and then the concrete can be poured. This method enables us to build the pile caps at a relatively fast pace, with as few people as possible on site. The concrete formwork system is treated with a concrete-repellent material and fitted with integrated spacers, so the elements can be dismantled relatively easily. In total, around 4,000 m³ of concrete, supplied by 300 concrete mixers, and 230 tonnes of reinforcement will go into the 260 pile caps.”

The new data centre is 22 metres high and 63 metres deep, and will have a total area of 27,000 m² across three storeys.
Alternative floor concept
Van Berlo is also building the floors in the data centre. Based on the original floor design, Van Berlo Engineering developed a more economical and budget-friendly alternative. “The original design specified a 25-centimetre-thick floor and enlarged pile heads,” says Frederik Crampe, Sales Manager Belgium at Van Berlo. “Our engineering department applied its expertise and came up with a better proposal. Although the floor was slightly thicker at 28 centimetres, using a different reinforcement method meant the enlarged pile heads were no longer needed. This brought considerable benefits and significant savings. The floor flatness meets the requirements of NEN 2747 Class 5. This is because a raised access floor will be installed on top. In total, we are building 9,653 m² on the ground floor and a further 18,662 m² across the two upper floors.”
This is not the first data centre Van Berlo has built. “We are now a familiar name in this sector too,” says Crampe. “We are currently busy casting the pile caps outside and building the floors. We will start work on the external floors in early June. Overall completion is scheduled for the end of September.”
Een zakelijke vraag aan Van Berlo? Neem contact op
Bedrijven in dit verhaal
Blijf dit volgen
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ThemaVloeren in beton en staal
- OnderwerpProjects
- BedrijfVan Berlo