UZ Gent car park: first piece of strategic masterplan
Tekst Roel van GilsBeeld Wyckaert

Simple but effective
UZ Gent is committed to the Paris Agreement and aims to make its campus carbon-neutral by 2050. The strategic masterplan includes a major redevelopment and greening of the campus, and eventually even the construction of a completely new hospital. The first piece of the masterplan has now fallen into place with the opening of the new car park for staff on the edge of the campus. A simple but effective building, thanks to a carefully considered combination of concrete and steel.

At the heart of UZ Gent’s masterplan is the construction of a new hospital building. “To make that possible, some moves have to be made first,” says Petra Demoor, new-build programme manager at UZ Gent. “For example, an interim building, called Nobel I, was completed at an earlier stage to temporarily accommodate certain hospital departments. These departments will later move to the central core, after which the interim building will be used for various spin-off activities associated with the hospital. The masterplan also includes bringing the campus car parks together. We are aiming for a greener campus, rather than one dominated by asphalt and surface parking. A large car park for patients and visitors will be built beneath the new hospital, while staff will park in the new car park from now on.”

Clear structure
The new car park was deliberately built on the edge of the campus. “This means our staff’s cars do not cross paths with the traffic for our patients and visitors. It makes getting around our campus smoother and safer,” says Demoor. “The design of the new car park was developed in collaboration with Ghent’s city architect, Peter Vanden Abeele, and is characterised by its open, understated character. A clean, clear structure that lets in plenty of daylight.” The multi-storey car park has eight floors and space for 1,818 cars. UZ Gent put the construction of the car park out to public tender and awarded the project to Wyckaert on the basis of the most economically advantageous tender. “As Petra has already pointed out, it is indeed a very open structure,” says Kurt Ornelis, senior project manager at Wyckaert. “Steel is ideally suited to achieving this elegance. The car park therefore consists largely of a steel frame, with concrete floor slabs and a structural topping. The steel core is quite unusual by Belgian standards, too. After all, we are a country of concrete.”

2,700 hollow-core slabs
Wyckaert began construction just after the construction holiday, on 8 August 2023. “The building has a footprint of 145 by 45 metres and is 29 metres high,” says Ornelis. “It also includes three lift cores, six stairwells and a high-voltage substation, with a plant room on every floor. A toilet block has also been built on the ground floor. Vehicles enter and leave the car park on opposite sides of the building, which is connected to a roundabout on the E17. A ramp at the exit provides access to the floors.”
Wyckaert used a total of 2,600 tonnes of steel in the building. “We also had special sections extruded to carry the loads,” Ornelis explains. “The floor slabs are 40 centimetres thick prestressed hollow-core slabs. A total of 2,700 were used, each weighing eight tonnes. Only three could be carried on each lorry. Delivering the hollow-core slabs alone therefore required 900 lorry journeys. A concrete structural topping was applied over the slabs. It is 32 centimetres thick at the outer edge of the car park, tapering to eight centimetres along the building’s central axis.”

Challenges
Although the car park was built on the edge of the campus, the construction company had limited space to work in. As a result, two of the three tower cranes were inside the car park. “We could not close off each floor completely, because we had to keep two zones open at all times,” says Ornelis. “The two cranes were not removed from the car park until January this year, after which we were able to finish everything. We also had to contend with the wettest year on record and severe frost. All these factors affected the construction schedule. We were only recently able to apply the epoxy coating to finish the structural topping and mark out the parking spaces. We also had to adjust the schedule for finishing and touching up the steel frame because of the weather.” Despite these challenges, Wyckaert completed the car park on time. It is now in full use by UZ Gent staff.

More greenery
Just two days after the new car park opened, UZ Gent began work on the next project: the underground car park beneath the future hospital. “This car park will be built in two halves,” says Demoor. “Its huge footprint of 150 by 200 metres fortunately makes it possible to build in phases. Once the first phase of the underground car park is complete, we will start using it. The existing above-ground car park for patients will then be demolished so that the second half of the underground car park can be built. After that, construction of the new hospital will begin.” The aim is to gradually eliminate all surface car parks before then. A new forecourt will be created, along with a more pleasant environment throughout the campus. “We want less asphalt, more greenery and more space for cyclists and pedestrians. At the moment, cars rule the campus. Soon, pedestrians and cyclists will.”
The new car park is not quite finished yet. A separate tender will be issued for the “solar roof”. “As many solar panels as possible will be installed on the multi-storey car park,” says Demoor. “They will also shield the cars on the top floor from the sun. In addition, they will supply power to the charging points and, of course, contribute to the hospital’s energy supply. The solar-panel roof will also make the car park part of the circular energy system and help achieve the ambition of making the campus carbon-neutral by 2050.”
Vraag over dit verhaal? Stel je vraag
Blijf dit volgen
Bij een nieuw verhaal krijg je een e-mail. Geen account nodig.
- ProjectParkeergebouw UZ Gent
- ThemaMinder CO2 in beton en staal