Projects

Jakoba Mulderhuis: The teaching theatre of the future

Text Marc Koehler ArchitectsPhotography Sebastian van Damme

Jakoba Mulderhuis: The teaching theatre of the future

New teaching building completes the Amstelcampus

The Amsterdam University of Applied Sciences (HvA) has opened its most sustainable, future-proof teaching building. Jakoba Mulderhuis, on Rhijnspoorplein, is the final piece of the Amstelcampus on Wibautstraat. The building can accommodate around 6,000 to 7,000 students from the Faculty of Technology.

Urban integration of the Amstelcampus

Jakoba Mulderhuis occupies a prominent site at the corner of Wibautstraat and Mauritskade, on the edge of the historic city centre and beside the Singelgracht. Together with the listed Benno Premselahuis across Wibautstraat, the building forms a gateway to the city. Along with a tall building element opposite, it creates a monumental presence that links the architectural features in the surrounding area. The building comprises a slender tower (54 metres, 13 storeys) and a low-rise block (33 metres, 6 storeys) on Mauritskade. In urban-planning terms, the tower’s location could be described as a masterstroke. Widening Wibautstraat creates a convincing urban entrance.

Flexibility for a future-proof building

Former HvA architecture students Marc Koehler (Marc Koehler Architects) and Nanne de Ru (Powerhouse Company) collaborated on the design of Jakoba Mulderhuis, bringing Architekten Cie. onto the design team in 2014. The result is a sustainable, flexible teaching building with an open character. The precast façade was installed without scaffolding and finished in accordance with passive-building principles, with recycled aluminium frames and natural stone. The Jura stone matches the colour of the neighbouring Theo Thijssenhuis, creating harmony with the surroundings and reinforcing the building’s monumental, future-proof character. Its open structure allows every floor to be laid out flexibly. The proportion of open and closed sections varies across the façades, according to orientation, views and solar exposure.

The atrium connects Jakoba Mulderhuis with Theo Thijssenhuis.
All floors open onto the atrium and have open terraces.

Atrium as a connecting space

An imposing atrium connects Jakoba Mulderhuis with the neighbouring Theo Thijssenhuis, which remained in use during construction. All floors open onto the atrium and have open terraces where students can work on their projects. The atrium creates an open atmosphere, filled with natural daylight. The architects aim to create a new public realm: a theatrical space for large events and exhibitions on the ground floor, with tiered platforms where students from different fields of knowledge can meet. 

Sustainability by default

The vision for a sustainable building is based on reuse, minimising consumption, using sustainable energy and building sustainably. Its flexible structure also makes Jakoba Mulderhuis future-proof over the longer term. The building can be adapted relatively easily for other uses because the high-rise and low-rise sections can function independently. In 2014, the design achieved a BREEAM ‘Excellent’ score of 76.22%, the second-highest rating for a sustainable design. The building now has an A++ energy rating. 

Paperless design

Jakoba Mulderhuis is one of the first projects in the Netherlands to be tendered using Building Information Modelling (BIM). The entire specification was issued digitally, and the digital model formed the basis of the contract. A fine example of ‘paperless design’. Given the lengthy design process, BIM made it possible to implement changes relatively quickly and make them visible to everyone. All the supporting information was incorporated into the design. This saved time and money and improved the quality of construction.   

Question about this story? Ask your question

Who worked on it

Jakoba Mulderhuis in Amsterdam

  1. ClientHogeschool van Amsterdam (HvA)
  2. DesignMarc Koehler Architects
  3. DesignPowerhouse Company
  4. Designde Architekten Cie
  5. Building and constructionVisser & Smit Bouw
  6. Building and constructionUnica
  7. Building and constructionABT
  8. Building and constructionLBP Sight
  9. Building and constructionRoyal Haskoning DHV
  10. Building and constructionBREED Integrated Design

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectJakoba Mulderhuis
  • SubjectProjects
  • CompanyHogeschool van Amsterdam (HvA)
  • CompanyMarc Koehler Architects
  • CompanyPowerhouse Company
  • Companyde Architekten Cie
  • CompanyVisser & Smit Bouw
Share this article

Follow on Beton & Staalbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.