HWC Het Groene Veld

Auxiliary heating plant on the A10 for Westpoort Warmte, with approximately 300 tonnes of steel.

  • PlaceAmsterdam-Noord
  • ClientWestpoort Warmte
  • ArchitectSOME architects
  • Companies involved5
  • Latest story17 August 2026

In brief

HWC Het Groene Veld on the A10 in Amsterdam-Noord is a peak-load and backup heating plant for the district heating network, built using approximately 300 tonnes of steel. The client is Westpoort Warmte, with Equans as the contractor. Buiting Staalbouw was responsible for the engineering, supply and installation of the steel structure.

Summary based on stories in Beton & Staalbouw up to and including 17 August 2026.

Who worked on it

  1. clientWestpoort WarmteMentioned in Meteorite on the Ring Road
  2. architectSOME architectsMentioned in Meteorite on the Ring Road
  3. Construction subcontractorK. DekkerMentioned in Meteorite on the Ring Road
  4. steelwork contractorBuiting StaalbouwMentioned in Meteorite on the Ring Road and 1 other story
  5. contractorEquansMentioned in Steel takes the lead in the ‘meteorite’

Advertisement

More projects

All projects
Den Haag

Binnenhof renovation

Rijksvastgoedbedrijf, de Architekten Cie., J.P. van Eesteren, Croonwolter&dros and Nico de Bont and more
Amsterdam

Van Gendt Hallen

Braaksma & Roos Architecten, Vic Obdam, Sophia Engineering and more
Rotterdam

Van Brienenoordbrug renovation

KnookStaal, Straal- en Schildersbedrijf Feijenoord and Nobel Waterwerken BV

Follow on Beton & Staalbouw

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.